top of page
All Posts
Your MEP Modelling Costs Keep Overrunning — Here's Why, and How We Structure Delivery to Stop It
If you run an MEP consultancy or contracting business, this will be familiar. You've scoped the modelling work. You've agreed a fee with a freelancer or outsourced team. The markups are packaged and handed over. Then the architect issues a new ceiling strategy. The structural engineer adds fire compartment beams in two corridors. The riser that was signed off at Stage 3 no longer fits the revised layout. The scope just changed — significantly. But the client is reviewing 2D d

Maciej Grabowiecki
Feb 94 min read
What to Look for When Choosing an Outsourced BIM Partner (MEP Edition)
Outsourcing BIM support can unlock serious capacity — or import risk into your projects. This practical MEP-focused checklist shows what to look for in a BIM partner: real coordination competence, a controlled delivery process, clear accountability, scalable resourcing, and alignment with UK BIM standards.

Maciej Grabowiecki
Feb 34 min read
5 Reasons MEP Coordination Fails — And What They Actually Cost You
You’re three weeks from Stage 4 issue. The architect has changed the ceiling void height — again. Your Revit model is two iterations behind structures, and nobody can agree who owns the corridor risers. The coordination meeting is in an hour and the clash report is 400 items long, with no indication of priority. If that feels familiar, this post is for you. Because most coordination failures aren’t caused by “bad engineers” — they’re caused by predictable breakdowns in owners

Maciej Grabowiecki
Feb 14 min read
bottom of page
